|
|||
Enter subhead content here
Oct 4, 2019 - Riverted the reinforcing L-angles to the saddle with A5 rivets. Oct 4, 2019 - Installed fairiing on lower section of rudder. Oct 4, 2019 - Plans call for down elevator limits between 12 to 15 degrees. Oct 4, 2019 - Installed 1/8 inch nylon material as the elevator hard stops. Oct 4, 2019 - After installation of the hard stops, the down deflection settled in at 14.3 degrees. Oct 15, 2019 - Removed the rudder. Ready for final cleanup. Riveted
the top support bracket with A5 rivets. Oct 15, 2019 - Filed and smoothed all the trimmed edges. Oct 15, 2019 - Riveted the rudder stops. Oct 19, 2019 - Rerouted wiring for elevator trim and tail light to eliminate
interference with elevator cables and horns. Oct 19, 2019 - Rerouted the wiring down the left side channel with wire clips.
Oct 19, 2019 - Also, riveted the lower elevator stops in place. Oct 28, 2019 - Rough cut opening in bottom of rudder to accommodate tail
light. Oct 28, 2019 - Cut 1 inch opening in molded tail bracket. Oct 28, 2019 - Locking ring for Tail Beacon ADS-B is screwed onto the molded
bracket. Oct 28, 2019 - The mounting bracket billed and clecoed to the rudder. Oct 28, 2019 - Inserted grommet and fed twisted pair wire through to provided power to the ADS-B unit. Oct 28, 2019 - The wire came through the bracket opening on the first try. Enter content here Enter content here Enter content here |
|||
|