JimSnyder/001.jpg
N601WD - Example of Zenith Zodiac CH 650 ( http://www.zenithair.com/zodiac/ch650/index.html )
JimSnyder/002.jpg
Features and internal structure of Zodiac CH 650.
JimSnyder/IMG_1824.JPG
May 19, 2009 - Took demo ride at Zenith Aircraft factory in Mexico, MO.  Purchased kit.
JimSnyder/IMG_1968.JPG
June 19, 2009 - Crate containing complete kit arrived.  Parts visible are the fuel tanks.
JimSnyder/IMG_2015.JPG
July 1, 2009 - Starting rudder assembly.  Making first cut on first part of the airplane.
JimSnyder/IMG_2028.JPG
Rudder assembled with clecos (temporary fasteners).
JimSnyder/IMG_2041.JPG
Final riveting of rudder.
JimSnyder/IMG_2044.JPG
July 4, 2009 - Rudder completed.  First component of the airplane.
JimSnyder/IMG_2087.JPG
Internal structure of horizontal stabilizer.
JimSnyder/IMG_2108.JPG
Wrapping skin on stabilizer.
JimSnyder/IMG_2118.JPG
July 15, 2009 - Horizontal stabilizer completed.
JimSnyder/IMG_2141.JPG
Working on elevator.
JimSnyder/IMG_2187.JPG
Testing and calibrating electric elevator trim control.
JimSnyder/IMG_2202.JPG
Grandson, Jordan, fascinated by riveting process.
JimSnyder/IMG_2211.JPG
July 26, 2009 - Elevator completed and connected to stabilizer with clecos.  Tail section now complete.  Total rivets used to date = 1035.
 