Nov 3, 2010 - Members of my local EAA Chapter 1311 visited to review my project. John Saalwaechter & Jim Winings
(foreground). Mike Mossman & Doug Moncreiff (background).
|
Nov 3, 2010 - Doug Moncreiff & Mike Mossman.
|
Nov 3, 2010 - Mike Mossman, Jim Winings and John Saalwaechter.
|
Nov 3, 2010 - Jim Buist & Vern Sullenger (foreground). Steve Weathers & John Broyles (background).
|
Nov 3, 2010 - David Stucker, Chuck Long, Gary Reynolds.
|
Nov 12, 2010 - Wings in cradle in grarage. Removing ailerons and flaps before transporting to hanger.
|
Nov 12, 2010 - Wings in cradle loaded in my son's trailer for towing to hanger.
|
Nov 12, 2010 - Wings made it to hanger unscathed.
|
Nov 12, 2010 - My son, Jason, and wife, Suzanne, helping with the wing move.
|
Nov 13, 2010 - Moved flaps, ailerons, horizontal stab, elevator, & rudder to hanger for storage. Here ailerons and
flaps cleco-ed back in place. Wings tucked away in hanger awaiting assembly to fuselage next year.
|
Nov 13, 2010 - Horizontal Stabilzer and Elevator.
|
Nov 13, 2010 - Rudder.
|
Nov 13, 2010 - Canopy (under padding) and canopy frame.
|
Nov 14, 2010 - Starting work on the Cabin Floor Pan.
|
Nov 14, 2010 - Drilled 6B8-8 Heel Support to the floor pan.
|
Nov 14, 2010 - Drilled 6B8-3 Rudder Bearing Channel to the floor pan.
|
Nov 14, 2010 - Drilled 6B10-2 bottom Support Channel to the floor pan.
|
Nov 23, 2010 - Front bottom longerons. Both ends of each need to be trimmed at 30 degrees.
|
Nov 23, 2010 - Front bottom longerons cut and ready for installation.
|
Nov 23, 2010 - front bottom longerons drilled and cleco-ed to floor pan.
|
Nov 23, 2010 - Bottom view of from longerons cleco-ed to bottom of floor pan.
|
Nov 23, 2010 - Rear seat panel ready to drill to rear fuselage. Must be drilled from bottom side.
|
Nov 23, 2010 - Rear Seat Panel and main Gear Channel cleco-ed to rear fuselage bottom.
|
|
|
|